Mounting and removal of masking covers:


Gently lever up and release the catch of the masking cover from the housing



 Positioning of air distributor blades

Modify air-flow direction by manually setting the air distributor in one of 5 positions.






 Installation:


Installation screws and bolts not supplied. Unit can be installed on any support structure ensuring a fast and stable fixing.

Remove masking covers on both sides to fix mounting brackets to the unit.

(1) Ceiling mounting using installation bolts
Screw mounting brackets to the ventilator unit in vertical position using M8x16 screws (A) (supplied) as shown on the drawing.

(2) Wall mounting
Screw mounting brackets to the ventilator unit in horizontal position using M8x16 screws (A) (supplied) as shown on the drawing.

The unit is sold In the set:
air curtain
remote controller
2 mounting brackets
4 screws M8x16
brochure with technical documentation



 Connection of heating agent:


Protect the exchanger ferrule against torsion while connecting to the heating agent piping.
Avoid load transfer from heating agent piping to the heater ferrules.

 

Operating position Service valve no.
1 2 3

A

 horizontal
 (up and down air stream)
discharge venting -

B

 vertical
 (left to right air stream)
venting - discharge
C  vertical
 (right to left air stream)
discharge - venting


(1) Venting of the unit is possible by unscrewing the screw of vent (position A - service valve (2), position B - service valve (1), position C - service valve (3)). Access to the service valve you can get by disassembling of plug by putting the allen key in a rubber cable. Venting of the medium heating by drainage plug (position A - service valve (1), position B - service valve (3), position C - service valve (1)). Access to the drainage plug is possible after disassembling of the plug.

(2) In case of venting coil in the horizontal position motor up you have to pay attention to defend the unit from the water into casing; a coil should be vent by a special rubber tube assembly to the service ferrule; you it should not be disassembled.

(3) In case of starting up the device after venting the heating medium you have to remember about venting the heating unit.




 ELECTRICAL CONNECTIONS :


Mounting of cable bushings for vertical (V) and horizontal (H) unit wiring arrangement.

DEFENDER XE (electrical heater) is equipped with a terminal strip adopted to electrical cabels 5 x 10 mm2

DEFENDER XW (water heater) is equipped with a terminal strip adopted to electrical cabels 3 x 6 mm2

We recommend to connect cabels to terminal strip with clenched endings.







   
Mission, values Technology Quality Business structure Career
Warranty
form
Designer
form
Download
See beauty Construction Technical parameters Installation Automatics Buy me Selection program
See beauty Construction Technical parameters Installation Automatics Buy me Selection program
Find us Invite us